5L20
Congratulations and thank you for purchasing a Rubbermaid storage building.
BEFORE YOU BEGIN – BUILDING CODES
Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances.
BEFORE YOU BEGIN – SURFACE PREPARATION
To ensure proper assembly and performance your shed needs to be built on a solid, level surface. A concrete or patio surface, or a
BEFORE YOU BEGIN – LOCATION
When choosing a location in your yard make sure you choose an area with easy access and one that provides proper drainage for water to run away from the shed location.
BEFORE YOU BEGIN – PREASSEMBLY
Thoroughly review all assembly steps (it is important that the steps are followed in the correct order). Review the parts list and make sure that no parts are missing.
IMPORTANT – DO NOT RETURN
TO THE STORE
For assistance with your Rubbermaid Storage Building or for additional product information call our
or visit us online at: www.rubbermaid.com.
Installation Steps:
1.Site Preparation
2.Floor
3.Walls
4.Roof & Doors
5. Finishing
76 ¾"
55 ¼" | 51 ½" |
|
Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Service |
|
Department can accurately and quickly assist you if necessary. | 1780069 |