c. Make sure Front Roof (J) is positioned tightly against the middle Repeat Roof (M) section.

Install Roof Pins (FF) in four places. If necessary, use Roof Pin Assembly Tool (GG) to pull the roof down.

1. Insert pin in slot.

2. Push all the way through.

3. Rotate head flush with roof.

 

click

FF

FF

 

FF

 

GG

Install Roof Pins four places.

d. Install Left Door (L) and Right Door (K) into hinge openings of Front Floor (A) and hinge sockets in Front Roof (J).

Note: Only raise front edge of roof enough to install the door hinge pins.

JJ

L

K

e. From inside the shed, install four Screws (AA) into the roof, two on each side wall.

Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof!

A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location.

AA (4)

RB

J

L

K

AA

Page 16
Image 16
Rubbermaid 5L20 instruction manual Insert pin in slot