Rubbermaid 5L20 instruction manual click, Snap Front Right Side H into Front Floor A

Models: 5L20

1 18
Download 18 pages 57.06 Kb
Page 12
Image 12
Snap Front Right Side (H) into Front Floor (A).

Drill a pilot hole (using 1/8" drill bit) in front lower corner

c.

Align the lap joint between Front Right Side (H) and

b. at location indicated by screw target.

Repeat Right Side (E).

 

Note: This pilot hole is to be drilled through both walls.

 

 

 

 

 

E

 

H

 

H

 

 

 

 

H

 

 

OVERHEAD VIEW

 

 

 

E

1

 

 

 

2

d.

Snap Front Right Side (H) into Front Floor (A).

Install Wall Connector (Q) 5 places, connecting

 

e. Repeat Right Side (E) and Front Right Side (H).

H

 

 

E

 

 

 

H

 

E

 

OVERHEAD VIEW

 

H

 

 

 

 

 

 

 

1

 

 

 

1

click

 

Q

 

 

 

2

 

 

 

 

ALIGN

 

 

ALIGN

 

click

 

 

Page 12
Image 12
Rubbermaid 5L20 instruction manual click, Snap Front Right Side H into Front Floor A