12 12 788 928
4343
40
42
39Locate the "Pre Acc" outlet between the engine bay main fuse box and the front wing and remove any adhesive tape or dummy connector.
40Plug the wiring harness from the installation set into the connector on the heater and route it through the bulkhead space to the "Pre Acc" outlet adjacent to the engine compartment elec- trical centre.
Important
The wiring harness must be located in the seals by the front wings.
41Connect the ground cable to the front grounding point (G30A) in the engine bay main fuse box.
42Connect the wiring harness to the four pole "Pre Acc" outlet.
Note
If the four pole "Pre Acc" outlet is already used, connect into the existing connector as follows
–Unplug "Pre Acc"
–remove the seal from the connector on the heater wiring harness and detach the cables from the connector block
–fit the cables into the connector which was plugged into
–Plug in the connector to "Pre Acc".
4343
43
42
41
F920A019
43Fasten the wiring harness with cable ties (x7). Position the
Important
Check that the drainage hose at the filter is cor- rectly fitted.
44 Thread the fuel pump wiring harness down alongside the fuel lines against the back edge of the frame member.
Saab