Installation

Installation

Step-by-step installation

STEP  1  Select a location

Location requirements:

Solid, level surface without carpeting or flooring that may obstruct ventilation

Away from direct sunlight

Adequate room for ventilation and wiring

The ambient temperature is always higher than the freezing point (0 °C)

Away from a heat source

STEP  2  Remove the shipping bolts

Unpack the product package and remove all shipping bolts.

1. Loosen all shipping bolts on the rear of the machine using the supplied spanner.

2. Fill the holes with the supplied plastic bolt caps.

Keep the shipping bolts for future use.

20  English

Untitled-2 20

 

 

5/23/2016 5:56:09 PM