6. Tighten two #8 x 3/4" Screws (1) into the

6

 

 

Console Base (87). Do not overtighten the

 

 

 

Screws.

 

 

 

Identify the right handrail assembly (B). Hold the

 

 

 

right handrail assembly near the right Upright

 

 

 

(77). Insert the wire from the right handrail as-

1

 

 

sembly into the hole in the top of the Upright

 

 

and out of the end of the Upright.

 

 

 

 

B

 

Wire

 

1

 

 

 

87

 

 

 

77

7. Set the right handrail assembly (B) onto the

7

 

 

right Upright (77). Make sure that no wires are

 

 

 

 

 

pinched. Attach the right handrail assembly

 

 

 

with two 3/8" x 5 1/2" Screws (5) and two 3/8"

 

 

 

Star Washers (8). Note: Start the lower Screw

 

 

 

first.

 

 

 

Connect the two “R” pulse wires.

B

 

 

 

“R”

 

 

 

Pulse

 

 

 

Wires

 

 

 

R

 

 

 

R

 

 

 

77

 

 

 

 

 

L

 

 

Console

 

 

8

Assembly

 

 

“L” Pulse

 

 

 

 

 

 

Wire

 

5

 

 

 

Start First

 

 

10

 

 

Page 10
Image 10
Sears NTL19010.0 user manual Console Base 87. Do not overtighten Screws, Right Upright 77. Make sure that no wires are