Automation and Drives - SCE

5.TESTING THE STEP 7 PROGRAM

The STEP 7 program to be tested can now be loaded into the PLC.

In our case, this is only OB1.

18.Save the organization block with and load it into the PLC by clicking on . When this is being done, the key switch on the CPU should be in the STOP position! ( → )

 

 

 

 

 

 

 

Foreword

Notes

Hardware configuration

STEP 7 program

Testing

 

 

 

 

 

 

 

 

 

T I A Training Document

 

Page 24 of 25

 

 

Module

 

 

 

 

 

A5

Issue date: 02/2008

 

 

Programming the CPU 314C-2DP

Page 24
Image 24
Siemens programming the cpu 314c-2dp manual Testing the Program