Installation
4.3 Installation on a standard rail
SCALANCE X-200
132 Operating Instructions, 12/2011, A5E00349864-19
4.3 Installation on a standard rail
Installing an IE Switch X-200 on a SIMATIC S7-300 standard rail
1. Place the upper guide at the top of the IE Switch X-200 housing in the S7 standard rail.
2. Screw the IE Switch X--200 to the underside of the standard rail.
3. Fit the connectors for the power supply.
4. Fit the connectors for the signaling contact.
5. Insert the terminal blocks or M12 cable connectors into the sockets on the IE Switch X-
200.
Figure 4-3 IE Switch X-200 installation on a SIMATIC S7-300 standard rail
Uninstalling
Removing an IE Switch X-200 from a SIMATIC S7-300 standard rail
1. First disconnect all connected cables.
2. Loosen the screws on the underside of the S7 standard rail and lift the IE Switch X-200
away from the rail.