2
Note:
THERE ARE FOUR MAIN THINGS TO CONSIDER BEFORE INSTALLATION
•Cavity Dimensions & Clearances
•Coupling of Flue to Fire
•Coupling of Gas Lines to Fire
•Fixing the Fire to the Cavity
The sequences you choose to do these tasks will vary on your individual scenario. Please read these instructions fully before proceeding with your installation.
Leave the installation of the fascia panels until the very end of the installation and commissioning to avoid damage to the fascia panels.
WARNING:
Failure to follow these instructions could cause a malfunction of the heater, which could result in death, serious bodily injury, and/or property damage. Failure to follow these instructions may also void your fire insurance and/or warranty.
Installation:
Installation must be carried out by a registered installer who, on completion of the installation, must issue a certificate of compliance, in accordance with national and/or local codes. If a certificate of compliance is not issued then the Escea warranty may be void.
This appliance needs fresh air for safe operation and must be installed with provisions for adequate combustion and ventilation air available to the room in which it is to be operating.
Warranty Repair and Annual Servicing:
Warranty repair work must be carried out by a recognised Escea gas fire technician. It is recommended that recognised Escea Gas fire technicians are also used to carry out annual servicing requirements (particularly during the warranty period). For contact details of authorised Escea technicians in your area, please contact the retailer from whom the appliance was purchased.
The heater must be installed according to these instructions and in compliance with all relevant building, gas fitting, electrical and other statutory regulations (eg. AS 5601
G8860 _4 Installation Manual NZ