28.0 Installation Check List: | Tick here |
|
1 Ensure there is adequate ventilation in the cavity.
2 Ensure the spark electrodes are correctly positioned.
3Operating pressure checked with heater running on full (all burners operating) and all other gas appliances in the house
switched on.
4 Flue Draw checked, 5 minutes after start up.
5 Logs in correct position.
6 Coals spread along front burner.
7 Heater run on high for 60 minutes with house doors and windows open to clear smell of paint and oils initial burn.
8Hearth and mantle clearances comply with these instructions.
9No combustible materials any closer to heater than these
instructions allow. 10 Heater fixed to wall and floor. 11 Leak test all joints and pressure test points. Soapy water drop
test done on pipe work. |
| ________ |
|
12 Wall mount cradle screwed to wall. |
|
|
13 House holder has been shown how to operate heater.
14Operator manual has been left out for house holder, installer has filled in their own details and heater serial number into
warranty card.
15 Ensure adequate access to power flue units.
16 If using a Power flue unit, make sure the electrical tray is wired up correctly.
17Inform the customer that the fire may continue smelling for a while after installation depending on frequency & duration of
use
18Given House Holder Plumbing Industry Commission Compliance Certificate.______________________________
G8860 _4 Installation Manual NZ