SAFETY INFORMATION

12

 

 

 

 

 

VICTORY

B. PUMP LOCATION-Locating low-head pump(s) on

 

SAFETY INFORMATION

 

 

 

 

return to boiler is acceptable for smaller boiler sizes in

 

For Your Safety Read Before Operating

residences of one or two stories. The alternate pump

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

location shown in illustration on page 11 is required in

 

WARNING: If you do not follow these instructions exactly,

large, multi-story building installations, especially when

 

a fire or explosion may result causing property damage,

high-head pumps are used. The compression tank

 

personal injury or loss of life.

 

 

 

 

must be at the boiler or between boiler and supply

 

 

 

 

 

 

 

 

 

A. This appliance is equipped with an ignition device

main pump(s).

 

 

which automatically lights the pilot. DO NOT try to

C. On a hot water boiler installed above radiation level,

 

 

light the pilot by hand.

 

 

 

 

the boiler must be provided with a low water cutoff

 

 

 

 

 

 

B. BEFORE OPERATING smell all around the appliance

device at the time of installation by the installer.

 

 

area for gas. Be sure to smell next to the floor because

OPERATING INSTRUCTIONS, BASIC

 

 

floor.

 

 

 

 

I. FILLING AND VENTING WATER SYSTEMS

 

some gas is heavier than air and will settle on the

 

WHAT TO DO IF YOU SMELL GAS

 

 

 

 

A. Fill the system with water. Vent or purge of air.

 

• DO NOT try to light any appliance.

 

 

 

 

B. Fire the boiler as soon as possible (see following warn-

 

 

 

 

 

 

• DO NOT touch any electric switch; DO NOT use

ing and instructions) and bring water temperature to at

 

 

any phone in your building.

 

 

 

 

least 180 degrees, while circulating water in the sys-

 

 

 

 

 

 

• Immediately call your gas supplier from a neighbor's

tem.

 

 

phone. Follow the gas supplier's instructions.

C. Vent air and add water as needed to achieve operating

 

 

• If you cannot reach your gas supplier, call the fire

pressure on boiler gauge. Pressure must be between

 

 

department.

 

 

 

 

approximately 12 psi (cold water) and 25 psi at water

 

 

 

 

 

 

C. Use only your hand to push in or turn the gas control

temperature setting of high limit control, for boilers

 

 

knob. NEVER use tools. If the knob will not push in or

equipped with 30 psi relief valves. Boilers rated for a

 

 

turn by hand, don't try to repair it, call a qualified ser-

higher pressure and equipped with a matching relief

 

 

vice technician. Force or attempted repair may result

valve may operate at a higher pressure, but no higher

 

 

in a fire or explosion.

 

 

 

 

than 5 psi below the relief valve opening pressure.

 

 

 

 

 

 

D. DO NOT use this appliance if any part has been

D. Check for and repair any leaks before placing system

 

 

underwater. Immediately call a qualified service tech-

in service.

 

 

nician to inspect the appliance and to replace any part

BEFORE FIRING BOILER, make these checks:

 

 

of the control system and any gas control which has

1. System is full of water. Air is vented or purged.

 

 

been underwater.

 

 

 

 

2. Relief valve is installed in accordance with ASME

 

 

 

 

 

 

Figure 11.

 

 

 

 

Boiler and Pressure Vessel Code, Section IV. Valve

 

 

 

 

 

opening is not closed or reduced in size.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3. Venting is installed according to instructions under

 

 

 

 

 

 

 

 

“FLUE GAS VENTING REQUIREMENTS”.

 

 

 

 

 

 

 

 

4. All wiring is completed, following applicable wiring

 

 

 

 

 

 

 

 

diagrams.

 

 

 

 

 

 

 

 

5. Using soap solution, check for gas leaks in all gas

 

 

 

 

 

 

 

 

piping from meter to boiler pilot and manifold.

 

 

 

 

 

 

 

 

DO NOT use open flame.

 

 

 

 

 

 

 

 

II. INITIAL START

 

OPERATING INSTRUCTIONS

 

used on the Victory Series Boilers under the ANSI

 

 

Safe lighting and other performance criteria were met

 

 

 

 

 

 

 

 

Z21.13- 1987 Standard.

 

FOR VR8204 OR VR8304 VALVE

when testing various gas manifold and control assemblies

 

 

 

 

 

 

 

 

Instructions

 

2. Set the thermostat to lowest setting.

 

 

 

 

 

 

1. STOP! Read the safety information above.

Follow the lighting instructions in this manual that apply to

 

3. Turn off all electric power to the appliance.

the particular ignition system equipped on this boiler.

 

 

4. This appliance is equipped with an ignition device

(Also, see figures on page 2 for location of gas manifold,

 

 

which automatically lights the pilot. DO NOT try to

gas valve and control assembly.) These instructions are

 

 

light the pilot by hand.

 

 

 

 

also attached to the boiler.

 

 

 

 

 

 

5. Turn gas control knob clockwise

to "OFF". DO

 

 

 

 

NOT force.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6. Wait five (5) minutes (longer for propane) to clear out

 

 

any gas, then smell for gas, including near the floor. If

 

 

you then smell gas, STOP! Follow "B" in the safety

 

 

information above. If you don't smell gas, go to next

 

 

step.

 

 

 

 

 

 

7. Turn gas control knob counterclockwise

 

 

to "ON".

 

 

 

 

 

 

 

 

 

Page 12
Image 12
Slant/Fin V-180, V-33 Victory, Safety Information, Operating Instructions, Basic, I. Filling And Venting Water Systems