250 Z & Javelin Series

Quick Setup List -

Page

Setup Procedure

Steps to Perform

6

Uncrating

Remove crate & banding.

 

 

Place transmissions in ROLL RELEASE position & roll off

 

 

skid.

 

 

 

7

Battery Activation &

Charge the battery (Note: proceed with other setup steps

 

Installation

while battery is charging).

 

 

Install & secure battery.

 

 

 

8

Check Fluid Levels

Fill & check Engine oil level.

 

 

Reduce & check tire pressures

 

 

(Front tires 25 psi, rear tires 15 psi).

 

 

 

9

Mower Assembly

Torque mower blade hardware.

 

 

 

9

Lubrication

Lubricate all grease & oil points.

 

 

 

10

SAFETY CHECKS

Check for LOOSE HARDWARE.

 

 

Check all OPERATOR CONTROLS.

 

 

Perform MOWER BLADE STOPPING CHECK.

 

 

(Blade must stop within 5 seconds!)

 

 

Perform SAFETY INTERLOCK SYSTEM CHECK.

 

 

 

10

Burnish Electric Clutch

Burnish electric clutch (run for 15 seconds, repeat 10 times).

 

 

Repeat MOWER BLADE STOPPING CHECK.

(Blade must stop within 5 seconds!)

1/2006

5

TP 300-5148-00-HZ-SN

Page 5
Image 5
Snapper ERZT185440BVE manual Quick Setup List