CDP-CE575
SECTION 4
ASSEMBLY
Note: Follow the assembly procedure in the numerical order given.
ADJUSTING PHASE OF SWING GEAR AND GEAR (U/D)
5stopper washer (FR)
3Let the swing gear through under the chassis h and engage its dowel g with the groove f of rotary encoder.
2Install the rotary encoder so that its groove f comes to the position shown in the figure.
1Insert the shaft gear up to the position where its shaft comes out by 5 mm.
8screw (PTPWH M2.6)
7gear (U/D)
4Push fully the shaft of shaft gear and align the hole shape of gear (loading B).
6 screw (PTPWH M2.6)
g
f
h
circle mark
circle mark
gear (RV)
swing gear
Fig. A
q; screw (PTPWH M2.6)
9 gear (RV)
Note: Align swing gear, a circle mark on the gear (U/D), and the teeth of gear (RV) to the position showing in the Fig. A.
13