Connections
Connect the unit to the
Notes
• Connect the AC power cord last.
• Before connecting to the LAN, be sure to set up the required IP address and
For detailed information, refer to “Setup Manual”
Preparation | provided in the latter part of this manual, and also | |||||||||||
| ||||||||||||
| consult the system administrator. | |||||||||||
| • Before connecting the unit using a | |||||||||||
| cable, attach the ferrite cores provided to both ends of | |||||||||||
| the cable for noise prevention. | |||||||||||
| For detailed information on how to attach the ferrite | |||||||||||
| cores, see “How to attach the ferrite cores” on page 8. | |||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to the network connector |
| to- AC IN |
| ||
|
|
|
Power cord
to the LAN
a)Be sure to use a network cable of less than 30 m in length, and rated more than category 5.
How to attach the ferrite coresBefore using the unit, attach the supplied ferrite cores for noise prevention.
To confirm to radiation standards, attach the supplied ferrite cores to both ends of the cable.
Ferrite core
Stoppers
About 13 mm (1/2 inch)
About 13 mm (1/2 inch)
1 Release the two stoppers to open the ferrite core.
2 Make a loop at the end of the cable about 13 mm (1/ 2 inch) away from the connector, and then attach the ferrite cores.
3 Close the ferrite core until it clicks.
8 Connections