MPC-5000 Wiring
Mount the control box on a vertical surface with the wire grommets down, central to the other system components. Make sure the cables will reach all of the modules to avoid splices.
Filter Sensor harness | Control cable 50’ (15.2M) | ||
6’ (2M) | Protect connector while routing through | dry central location. Only con- | |
| the vessel. | Control Box | nect the MPC “plug in” cable. |
Fresh water flush feed 15’ (4.5M) Splice to flush valve. Heat connectors to shrink.
Pump feed 4’(1.2M) may be | Main power feed. Install cover | Clark Pump harness, RotoFlow meter, | |
extended as required. Count | after terminating wires. |
| salinity probe, and diversion valve feed |
additional length in wire siz- | Use a 15 amp breaker or fuse | 15’ (4.5M). See next page. | |
ing. Wire fan in parallel. |
|
|
|
Wire Size Guide for Ventura 150 12V |
|
| |
Protect with 15 Amp Fuse or Circuit Breaker |
|
| |
# 10 Gauge (6mm) to 15 feet (4.5M) |
|
| |
# 8 Gauge (10 mm) to 25 feet (7.5M) | Total length for a pair of wires! | ||
#6 Gauge (16mm) to 35 feet (10.6M) |
Wire Size Guide for the Ventura 150 24V Protect with 7 Amp Fuse or Circuit Breaker #12 Gauge(4mm) to 10 feet (3M)
#10 Gauge (6mm) to 25 feet (7.6M) #8 Gauge (10mm) to 35 feet (10.6M)