Table of Contents
Section 1
Installation
Page Number
Introduction | 5 |
Getting Started | 6 |
Installation Basics | 7 |
Ventura Plumbing Schematic | 8 |
Feed Pump Relocation | 9 |
Product Water plumbing | 10 |
Tube Fitting Assembly Procedures | 11 |
Wiring | 14 |
MPC Tank Switch Wiring and operation……………………………………………….. 16 | |
Z Brane Installation | 43 |
Operation |
|
New Systems Start Up and Testing | 17 |
Dry Testing | 21 |
Normal Start Up Using the Auto Run | 22 |
Flushing | 23 |
Manual Operation | 24 |
Maintenance | 28 |
Service & Maintenance |
|
Long Term Storage Procedures | 25 |
Winterizing | 27 |
Maintenance | 28 |
Membrane Cleaning | 29 |
Suggested Spares | 31 |
Troubleshooting Procedures, Service Bulletins | 33 |
Part Numbers | 46 |
Section 2: Programming & Controls |
|
Programming from the display…………………………………………….……………..13 | |
Tank Switch Operation and Installation …………………………………………………16 | |
Programming from a Computer…………………………………………………………..16 | |
Software Installation……………………………………………………………………...17 | |
Software Port Settings …………………………………………………………………...18 | |
Software Features ………………………………………………………………………..22 | |
Computer Settings ………………………………………………………………….……25 | |
Salinity Probe Calibration ……………………………………………………….………26 3 | |
Detailed Controls Data……………………………………………….……….…...……..28 |