INSTALLATION SEQUENCE

For installations in the City of Los Angeles, California Category IV PVC Pipe such as that manufactured by Brownline Pipe Company, must be used as vent pipe material.

CAUTION

VENT TERMINALS SUPPLIED WITH HEATER MUST BE USED.

NOTE: BEFORE BEGINNING INSTALLATION OF ANY VENT PIPE READ THE VENT PIPE MANUFACTURER’S INSTALLATION INSTRUCTIONS.

1.After the points of termination have been determined, use the cover plates as templates to mark the holes for the vent pipes to be inserted through the wall. BEWARE OF

CONCEALED WIRING AND PIPING INSIDE OF WALL. If the vent terminals are being installed on the outside of a finished wall, it may be easier to mark both the inside and outside wall. Align the holesby drilling a hole through the center of the template from the inside through to the outside. The template can now be positioned on the outside wall using the drilled holes as a centering point for the template.

A.) MASONRY SIDE WALLS Chisel an opening approximately 1/2” (1.3 cm) larger than the marked circle.

B.) WOODEN SIDE WALLS Drill a pilot hole approximately one quarter inch outside of the marked circle. This pilot hole is used as a starting point for a saws-all or sabre saw blade. Cut around the marked circle staying approximately one quarter inch outside of the line. (This will allow the vent pipe to easily slide through the opening. The resulting gap will be covered by the vent terminal cover plates.) Repeat this step on the inside wall if necessary.

2.Cut a length of 3” PVC pipe about 3.5” (8.9 cm) longer than the wall thickness at the opening.

3.Glue the intake vent terminal to the section of the pipe.

4.Slide the wall plate over pipe to stop against intake vent terminal.

5.Place a bead of caulking (not supplied) around the gap between the pipe and the wall. Place some of the caulking on the back of the plate to hold it against the wall after installation.

6.If the vent pipe is installed up to the wall, with a coupling on the end against the wall opening, the pipe with the vent terminal can be prepared for gluing before inserting through the wall. Slide the pipe through the wall and insert into coupling on the other side of the wall, making sure that the vent terminal ends up pointed in the correct position (Figure 19).

VERTICAL VENT TERMINAL INSTALLATION

IMPORTANT

WHEN TERMINATING THROUGH A ROOF, THE FOLLOWING SPECIFICATIONS PERTAINING TO TERMINAL LOCATION MUST BE FOLLOWED.

1.Proper support must be provided for all pipe protruding through the roof.

2.The vertical roof terminations should be sealed with a plumbing roof boot or equivalent flashing.

3.The intake vent termination and the exhaust vent termination must penetrate the same side of roof.

4.The center line of the intake vent termination and the center line of the exhaust vent termination must be no closer than 24” (61cm).

5.The intake vent terminal and the exhaust vent terminal must be oriented facing downward and the same direction.

The specifications are displayed in Figures 20 & 21.

NOTE: Exhaust vent terminal is installed using the same procedure.

FIGURE 20.

FIGURE 19.

FIGURE 21.

21

Page 21
Image 21
State Industries Power Vent/Power Direct Vent Gas Models Installation Sequence, Vertical Vent Terminal Installation

Power Vent/Power Direct Vent Gas Models specifications

State Industries offers a range of power vent and power direct vent gas models that cater to various residential and commercial heating needs. These models are designed for efficiency, safety, and convenience, making them a popular choice among consumers seeking reliable water heating solutions.

One of the standout features of State Industries' power vent models is their ability to vent directly through walls or roofs, enabling installation in locations where traditional venting methods may pose challenges. This flexibility makes them ideal for homes without suitable chimney access. The power vent system employs a fan to push exhaust gases out, ensuring efficient operation even in cases where vertical venting is not feasible.

The power direct vent models take this a step further by utilizing sealed combustion technology. This means they draw air for combustion from outside the home, which significantly reduces the risk of backdrafts and improves indoor air quality. The dual-venting system of these models also enhances their efficiency, as it allows for better control of air flow and exhaust.

State Industries incorporates advanced technologies in their gas models, including electronic ignition systems that eliminate the need for a standing pilot light. This feature not only enhances energy efficiency but also adds convenience for users. Moreover, these models come equipped with LED indicators that provide real-time status updates, enabling users to monitor their units easily.

Durability and reliability are hallmarks of State Industries products. The tanks are constructed with high-quality materials and feature protective coatings that inhibit corrosion, ensuring a long lifespan. In addition to this, many models are backed by extended warranties, providing peace of mind for consumers.

Energy efficiency is a critical characteristic of these gas models, with many units meeting or exceeding energy efficiency standards set by the Environmental Protection Agency (EPA). This results in lower utility bills and a reduced environmental impact. With adjustable temperature settings, users can optimize their water heating experience while conserving energy.

In conclusion, State Industries' power vent and power direct vent gas models stand out for their flexibility in installation, advanced technologies, and energy-efficient operation. Whether for residential or commercial use, these models offer high performance and reliability, ensuring that users enjoy a consistent and efficient hot water supply.