VENTING (continued)

Figure 23 - Horizontal Intake/Vent Installation

Figure 24 - Horizontal Intake/Vent Installation

Building Overhang

3'-0" Min.

(0.9M Min.)

Adjacent Building

6'-0" Min.

(1.8M Min.)

Vent Terminal

D 3330

29

Page 29
Image 29
Sterling GG-75, GG-90, GG-60, GG-45, GG-120, GG-30, GG-105 specifications Horizontal Intake/Vent Installation