2.4. Electrical connection

»

The electrical connection may only be carried out by trained per- sonnel.

Other persons are not permitted to carry out the electrical con- nection.

The rules of the local electricity board must be observed.

Before beginning the electrical connection, make sure that the mains voltage and the power frequency are in accordance with the data on the name plate of the device.

All work may only be carried out when the unit is at zero voltage and at zero pressure.