Sterling SSK-5 operating instructions Please observe the maintenance intervals, Maintenance

Models: SSK-5

1 33
Download 33 pages 18.56 Kb
Page 18
Image 18
Please observe the maintenance intervals.

L

SSK-5

Disconnect the equipment from mains supply before starting maintenance procedures to ensure that it cannot be switched on unintentionally.

Depressurize all compressed air piping of the equipment be- fore starting maintenance work.

F

Please observe the maintenance intervals.

Before starting maintenance work, clean the equipment of oil, fuel or lubricants.

Ensure that materials and incidentals required for operation as well as spare parts are disposed of properly and in an envi- ronmentally sound manner.

Use only original Sterling spare parts.

Keep record of all maintenance and repair procedures.

SM3-615

Maintenance 17

Page 18
Image 18
Sterling SSK-5 operating instructions Please observe the maintenance intervals, Maintenance