Sterling SSPE 5 manual Putting into operation, Sspe

Models: SSPE 5

1 35
Download 35 pages 38.47 Kb
Page 19
Image 19
4. Putting into operation

SSPE 5

4. Putting into operation

»

F

This chapter is intended for operating personnel.

Prerequisite for this chapter is general knowledge of the opera- tion of conveying units.

Also prerequisite for this chapter is that the functional descrip- tion has been read and understood.

Ensure in each case that the operating personnel are suffi- ciently informed.

Observe the manual of the conveying system.

Make sure that the On/Off switch of the hopper loader con- nection housing is in position “1".

SM4-620

Putting into operation 18

Page 19
Image 19
Sterling SSPE 5 manual Putting into operation, Sspe