SSPE 5
5.1. Maintenance intervals
Daily: | check warning signs on equipment for good |
| legibility and completeness. |
Weekly: | check the maintenance unit |
| check the operating pressure in the factory |
| ductwork system (max. 6 bar (87.02 PSI) system |
| overpressure) |
Monthly: | check the sealings on the filter cartridges |
| (according to the accumulation of dust) |
Every six months: | check filter contamination, if necessary clean or |
| replace the filter cartridges |
| check all electrical and mechanical connections |
| for proper fit |
| check the settings of the level probes (if available) |
| check the sealing ring on the outlet flap |
Yearly: | replace the sealing ring on the outlet flap |
F | The given maintenance intervals are average values. |
Check whether in your individual case the maintenance in- | |
| tervals must be shortened. |
|
|
Maintenance 23