Sterling manual SSPE 5.1. Maintenance intervals

Models: SSPE 5

1 35
Download 35 pages 38.47 Kb
Page 24
Image 24
SSPE 5

SSPE 5

5.1. Maintenance intervals

Daily:

check warning signs on equipment for good

 

legibility and completeness.

Weekly:

check the maintenance unit

 

check the operating pressure in the factory

 

ductwork system (max. 6 bar (87.02 PSI) system

 

overpressure)

Monthly:

check the sealings on the filter cartridges

 

(according to the accumulation of dust)

Every six months:

check filter contamination, if necessary clean or

 

replace the filter cartridges

 

check all electrical and mechanical connections

 

for proper fit

 

check the settings of the level probes (if available)

 

check the sealing ring on the outlet flap

Yearly:

replace the sealing ring on the outlet flap

F

The given maintenance intervals are average values.

Check whether in your individual case the maintenance in-

 

tervals must be shortened.

 

 

SM4-620

Maintenance 23

Page 24
Image 24
Sterling manual SSPE 5.1. Maintenance intervals