SSPE 5
5.2. Replacing the outlet flap sealing ring
»
Stop the conveying procedure.
Switch off the hopper by means of the on/off switch on the con- nection housing.
Switch off the conveying control by means of the main switch.
Disconnect the unit from mains supply.
Depressurize all system sections of the equipment.
Remove the tension ring (A).
Remove the upper part of the hopper loader with hopper lid.
Draw the old sealing ring off the nozzle of the material outlet.
Install the new sealing ring.
F
Observe the direction of installation (B).
Set the flap switch.
Install the upper part of the hopper loader.
Install the tension ring (A).SSPE 5 Install the hopper loader.
& | Order number sealing ring: ID 23098 |
Maintenance 24