Sterling SSPE 5 manual SSPE 2.4. Electrical connection, Installation instructions

Models: SSPE 5

1 35
Download 35 pages 38.47 Kb
Page 15
Image 15
SSPE 5

SSPE 5

2.4. Electrical connection

»

The electrical connection may only be carried out by trained per- sonnel.

Other persons are not permitted to carry out the electrical con- nection.

The rules of the local electricity board must be observed.

Before beginning the electrical connection, make sure that the mains voltage and the power frequency are in accordance with the data on the name plate of the device.

All work may only be carried out when the unit is at zero voltage and at zero pressure.

1KL (= flap switch)

2bridged with 4

3SV (= diaphragm valve)

4bridged with 2

5+ 24 V

60 V

7PE

connection point diaphragm valve (SV) connection controller SSP

connecting plug “flap switch (KL)”

connecting plug “conveyor control”

SM4-620

Connection housing hopper

Installation instructions 14

Page 15
Image 15
Sterling SSPE 5 manual SSPE 2.4. Electrical connection, Installation instructions