STT 110 / STT 160

3. Start up

»

F

This chapter is addressed to the operators of the machine.

This chapter assumes general skills with drying equipment.

This chapter assumes that the functional description has been read and un- derstood.

It must be ensured that the operators have the required experience.

Make sure that the main switch is at “0" position.

Check the drying hopper for cleanliness.

Check to see whether the adhesive film on the drying hopper has be re- moved.

If there is a return air cooler, switch on its coolant circuit.

If there is a timer clock (optional), adjust it. Read the operating manual of the timer clock.

Check whether the release switch “Timer” and the release switches “Hopper” (ST1 - ST6) are at ”0" position.

&

The signal lamp “trouble” may flash shortly while the valve block is chan- ged.

SM2-605

Start up 3-1

Page 15
Image 15
Sterling STT 110, STT 160 manual Start up