Sterling STT 160 manual STT 110 / STT 3.1. Initial Operation, Switching on the Dryer, Start up

Models: STT 110 STT 160

1 57
Download 57 pages 29.35 Kb
Page 16
Image 16
STT 110 / STT 160

SM2-605

STT 110 / STT 160

3.1. Initial Operation

Check whether the inlet of the drying hopper is closed by a blind lid, or whether a conveyor unit (optional) is installed.

If not, manufacture a suitable blind lid and install it on the inlet of the drying hopper or install the conveyor unit (optional).

F

Attachments which are not supplied by Sterling must be manufactured

according to the safety regulation European Standard 294.

Check whether the coolant circuit of the return air cooler is turned on (if a return air cooler is instal- led).

3.1.1. Switching on the Dryer

Switch on the main switch of the dryer.

&

The signal lamp “power” goes on.

 

 

For operation with timer clock (optional):

Turn the release switch “Timer” at position:

For operation without timer clock:

Turn the release switch “Timer” at position:

&

The blower is running.

 

 

F

If the dryer has not been in use for several months it must be operated for

about 2 hours without material.

Start up 3-2

Page 16
Image 16
Sterling STT 160 STT 110 / STT 3.1. Initial Operation, Switching on the Dryer, Start up, For operation without timer clock