Sterling STT 160 manual STT 110 / STT, Maintenance

Models: STT 110 STT 160

1 57
Download 57 pages 29.35 Kb
Page 31
Image 31
Manual background

STT 110 / STT 160

ST 25

Open the toggle-type fasteners (A) at the hopper lid and fold the hopper lid upwards (if in use: remove be- fore the single conveyor).

Clean the drying hopper.

Close the hopper lid and close the toggle-type fasten- ers (A) (if in use: re-mount the single conveyor).

Manual background A

TT 25

F

Remove any granules remaining in the cleaning opening.

SM2-605

Maintenance 5-8

Page 31
Image 31
Sterling STT 160 manual STT 110 / STT, Maintenance