Sterling STT 300 operating instructions Maintenance

Models: STT 300

1 85
Download 85 pages 41.96 Kb
Page 45
Image 45
5. Maintenance

STT 300

5. Maintenance

»

L

SM2-615

This chapter is intended for persons with skills in electrical and mechanical areas due to their training, experience and received instructions.

Personnel using the instructions in this chapter must be instructed of the re- gulations for the prevention of accidents, the operating conditions and safety regulations and their implementation.

Ensure in each case that the personnel are informed.

For maintenance work taking place at heights of over approx. 6 feet (1829mm), use only ladders or similar equipment and working platforms in- tended for this purpose. At greater heights, the proper equipment for protec- tion against falling must be worn.

Use only suitable lifting gear which is in proper working order and load sus- pension devices with sufficient carrying capacity. Do not stand or work under suspended loads!

Ensure that the electric motors/switch cabinets are sufficiently protected against moisture.

Use only suitable workshop equipment.

Before starting maintenance work, appoint a supervisor.

Inform the responsible personnel before maintenance work on the system is started.

Never operate the equipment when partially dismantled.

All maintenace and repair work not described in this chapter, may only be carried out by Sterling service personnel or authorized personnel (appointed by Sterling).

Disconnect the equipment from mains supply before starting maintenan- ce procedures to ensure that it cannot be switched on unintentionally.

Depressurize all compressed air piping of the equipment before starting maintenance work.

Maintenance 5-1

Page 45
Image 45
Sterling STT 300 operating instructions Maintenance