Sterling STT 300 Maintenance, Remove the protective grid of the blower position

Models: STT 300

1 85
Download 85 pages 41.96 Kb
Page 53
Image 53
Remove the protective grid of the blower (position 3).

STT 300

Blower ”regeneration heater” / Blower ”drying heater”

1

2

3

6

5

4

3

Remove the protective grid of the blower (position 3).

Loosen the nut (position 1).

Loosen and remove the screw (position 2).

Slide motor with carrier flange plate (position 6) towards the carrier flange housing (position 4). Remove defective V-belts (position 5), put on new ones.

F

Attention should be given to exact alignment of the V-belt pulleys.

Adjust belt tension by screw (position 2) in accordance with the information sticker. Tighten the nuts on threaded bolt (position 1) again.

Mount the protective grid of the blower (position 2).

Mount the side panels.

SM2-615

Maintenance 5-9

Page 53
Image 53
Sterling STT 300 operating instructions Maintenance, Remove the protective grid of the blower position