|
|
| Slot |
|
|
| Shaped End of |
|
| #8 x 3/8" | Center Jamb |
|
|
| |
| Storage |
| |
Wall Jamb | Column | Screw |
|
|
|
| |
Inside of |
|
| Inside of |
Bath |
|
| |
|
| Shower | |
|
|
| |
Outside |
| Screw | Side View |
of Bath |
|
| Center |
|
|
| |
Bottom Track |
|
| Jamb |
|
|
|
Wall
Outside Jamb
of Bath
Bottom Track
Inside of Bath
6. Install the Storage Column
Position the bottom frame piece of the storage column over the bottom track assembly. Slide the storage column into place in the chosen wall jamb.
Position the storage column so the shelves will be level.
NOTE: The self drilling screws will create their own hole. No pilot hole is needed.
Position a #8 x 3/8″ self drilling screw in each slot with the tip positioned in the groove in the storage column frame and tighten.
7. Install the Center Jamb
Determine which end of the center jamb is shaped to ®t over the bottom track.
Place the center jamb on the bottom track with the shaped side down and the slots to the inside of the bath.
NOTE: The self drilling screws will create their own hole. No pilot hole is needed.
Secure the center jamb in place with three #8 x 3/8″ self drilling screws.
8 | Sterling |