Sun Microsystems 3510 manual General procedure for creating this configuration follows

Models: 3510

1 30
Download 30 pages 45.07 Kb
Page 26
Image 26

The general procedure for creating this configuration follows.

1.Check the position of installed SFP modules. Move them as necessary to support the connections needed.

2.Connect expansion units if needed.

3.Configure cache optimization

4.Ensure fibre connection option is set to point-to-point.

5.Ensure only one target ID per channel is configured.

6.Create at least two logical drives and configure spare disks.

7.Create one or more logical drive partitions for each server.

8.Map Logical Drive 0 to channels 0 and 4 of the primary controller

9.Map Logical Drive 1 to channels 1 and 5 of the secondary controller.

10.If more than two logical drives were created, map even-numbered logical drives to channels 0 and 4 of the primary controller and odd-numbered logical drives to channels 1 and 5 of the secondary controller.

11.Connect the first switch to port 0 of the upper controller and port 1 of the lower controller.

12.Connect the second switch to port 4 of the lower controller and port 5 of the upper controller.

13.Connect each server to each switch.

14.Install and enable multipathing software on each connected server.

22 Sun StorEdge 3000 Family Best Practices Manual • October 2003

Page 26
Image 26
Sun Microsystems 3510 manual General procedure for creating this configuration follows