B e f o r e Y o u B e g i n
BEFORE YOU BEGIN |
| |
|
| |
Read "Requirements" and | ||
36 | ||
“Important Safeguards” before | ||
| ||
|
attempting to assemble the Easytrack System.
1. | Survey the room where you plan to |
|
| install the Easytrack System. Make |
|
| sure the room meets all the specifi- |
|
| cations outlined in "Requirements". | Figure 1 |
2. | Use the measurements below to |
determine the best place to put the Easytrack System:
a.Over a bed - approx.
b.Over a tub - approx.
c.Allow 36" (1000 mm) of open area for transfer working space (Figure 2).
d.Transfers should only take place between the Easytrack System posts (Figure 3).
3.Though it is not a requirement to place the posts directly under a joist in the ceiling, it is preferable. It does not matter which direction the top plate is facing (Figures 4 & 5).
Figure 3
| ] |
20" | m |
m | |
[510 |
|
108" | – 2746 mm] |
84" – | [2130 |
8" | mm] |
[200 |
|
5
18"– 16 36"
Figure 2
74. |
|
| |
8" |
|
| |
[1900 |
| – |
|
|
| 124. | |
| – |
| |
|
| 3160 | 5" |
|
|
| mm] |
|
| 8" |
|
| [200 |
|
| mm |
.8" | ] | |
| ||
4 | mm] | |
[120 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PREFERABLE |
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Joists |
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Sheet |
|
|
|
|
|
|
|
|
|
|
|
|
| rock |
| Easytrack |
|
|
|
|
|
|
|
| ||||
| post |
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
| Easytrack | ||||||
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
| post | |
|
|
|
| OK |
|
|
|
| OK |
| |||
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Figure 4
OK
Joists
Sheet rock
Easytrack post
Figure 5