TS 870 TRANSFER SWITCH
22.PERFORMANCE TEST FORM
This form should be retained by those in charge of the building electrical installation in order to be
available to the authority having jurisdiction.
Date | Personnel |
| Tests performed |
| Comments |
|
|
|
|
|
|
|
|
| Interconnection evaluation |
|
|
|
|
|
|
|
|
|
|
| Grounding point evaluation |
|
|
|
|
|
|
|
|
|
|
| Fault current test: |
|
|
|
|
|
|
|
|
|
|
| Ground fault settings - |
|
|
|
| ______________________________ |
|
| |
|
|
|
|
|
|
|
|
| Simulated current - |
|
|
|
| ______________________________ |
|
| |
|
|
|
|
|
|
|
|
| Results - |
|
|
|
| ______________________________ |
|
| |
|
|
|
|
|
|