Model 200EU-NOy Option Manual Addendum

2.3 Initial Operation

1.After confirming proper supply voltage, turn on the instrument power. If you are unfamiliar with the M200EU with NOy Option, we recommend that you read the overview in Section 3 before proceeding.

The power indicator light and display should immediately light, in addition the bypass pump should start up. The Bypass Pump Chassis requires about 30 minutes for the converter to come up to temperature.

While the converter is coming up to temperature, the M200EU analyzer should be powered-up. Also, follow the instructions in the M200E Manual and the M200EU Addendum to confirm proper operation of that instrument. Note: It will take 30 minutes for the ozone generator to start up in the M200EU. During that time the instrument will not respond to span gas.

After 30 min, the display on the Bypass Pump Chassis should read 315oC, indicating that the converter is up to temperature.

2.Proceed to Section 4 of this manual to do a Zero/Span check.

Table 1 Final Test and Calibration Values

 

Test Values

Observed Value

Units

Nominal Range

 

 

 

 

 

 

 

 

 

CONVERTER TEMP

 

oC

315

7

 

 

BYPASS FLOW – NO CHANNEL

 

CC/MIN

800

80

 

 

 

 

 

 

 

 

BYPASS FLOW – NOy CHANNEL

 

CC/MIN

800 ± 80

 

 

 

 

 

 

 

 

Converter Serial # __________________________

 

 

 

 

Date _______________________

 

Technician _____________________

05386 Rev. D

9

Page 13
Image 13
Teledyne 05386D manual Initial Operation, Final Test and Calibration Values