Installation Model 3300ZB
Teledyne Analytical Instruments 14
Figure 3-3: Piping Diagram
3.5 Installation Checklist
Before connecting the instrument to a power source and applying
power, make sure you have:
Correctly installed the sample and exhaust gas lines
Checked for leaks
Set the sample pressure to 5-10 psig nominal
Once the above checks have been made, you can apply power. The
instrument is now ready for operation.