Installation

Model 3300ZB

 

 

 

Figure 3-3: Piping Diagram

3.5 Installation Checklist

Before connecting the instrument to a power source and applying power, make sure you have:

Correctly installed the sample and exhaust gas lines

Checked for leaks

Set the sample pressure to 5-10 psig nominal

Once the above checks have been made, you can apply power. The instrument is now ready for operation.

Teledyne Analytical Instruments

14

Page 24
Image 24
Teledyne 3300ZB operating instructions Installation Checklist, Piping Diagram