Trace Oxygen Analyzer Installation
Teledyne Analytical Instruments 9
Installation
Installation of the analyzer includes:
1. Unpacking the system.
2. Mounting the control unit to a wall.
3. Making the electrical connections.
4. Making the gas connections.
5. Testing the installation.
CAUTION: READ THIS CHAPTER IN ITS ENTIRETY BEFORE
INSTALLING THE UNITS.
THE MODEL 3300ZB IS FOR INDOOR USE ONLY.
THE SAMPLE MUST BE FREE OF ENTRAINED
SOLIDS, WATER, OR COMBUSTIBLE COMPOUNDS.

3.1 Unpacking the Analyzer

As soon as you receive the instrument, carefully unpack and inspect
control unit, external probe, and any included accessories for damage.
Immediately report any damage to the shipping agent. The analyzer is
shipped with all materials needed to install and prepare the system for
operation.