Teledyne IGE 3000 instruction manual Installation, Receiving Inspection, Mounting, Grounding

Models: IGE 3000

1 21
Download 21 pages 23.15 Kb
Page 8
Image 8

3. Installation

3.1.INSTALLATION

3.2.Receiving Inspection

Your instrument has been manufactured, calibrated and carefully packed so that upon receiving your order it is ready for operation. However, when you unpack, please inspect all items for any obvious signs of damage due to shipment. Immediately advise Teledyne Hastings and the carrier if any damage is suspected.

Use the packing slip as a check list and insure all parts are present including any optional equipment and that the options are correct (i.e. output, range, gas, pin out)

If a return is necessary, obtain an RMA (Return Material Authorization) number from our Customer Service Department at 1-800-950-2468.

3.3.Mounting

The IGE-3000 is an “indoor use only” instrument. The IGE-3000 can be mounted in any attitude or position. Reasonable care should be taken to install the IGE-3000 where it will be protected from physical damage. To facilitate ease of reading the LED readout, the connector “keyway” of the B/A tube should be mounted at the 3 o-clock position.

3.4.Grounding

For safety reasons the case of the IGE-3000 must be grounded to the vacuum chamber.

This is normally accomplished mechanically through the vacuum chamber base flange via the B/A tube physical connection. The electronics module is grounded through a pin in the

connector plug once the IGE-3000 module is plugged into the B/A tube. To ensure the best grounding possible, ensure that the tube to base set screw is fully tightened once the IGE-3000 is installed.

DANGER

Ion producing equipment such as the IGE-3000, from any manufacturer, may, under some conditions provide sufficient conduction via plasma to couple a high voltage electrode to the vacuum chamber. If conductive parts of the chamber are not grounded, they may attain a potential near that of the high voltage electrodes during this coupling. Potentially fatal electrical shock could then occur because of the high voltage between these vacuum chamber parts and ground. Grounding, though simple, is imperative! Ensure that the ground circuits are correctly utilized, both on your IGE-3000 power supplies and your vacuum chambers, regardless of the manufacturer, for this phenomenon is not peculiar to the IGE-3000.

IGE 300

Page 8 of 21

Page 8
Image 8
Teledyne IGE 3000 instruction manual Installation, Receiving Inspection, Mounting, Grounding