Table of Contents |
| |
2 | ||
0 Introduction | 3 | |
1 | 4 | |
1.1 | Overview of the | 4 |
1.2 | Enclosure Rigging Hardware Details | 6 |
1.3 | Rear Rigging Hinge Details | 10 |
1.4 | Front Rigging Strap Details | 13 |
1.5 | Xvbp | 16 |
1.6 | ATM | 17 |
1.7 | 18 | |
2 | 19 | |
2.1 | Array Considerations | 19 |
2.2 | Adjusting the Vertical Angles of the Enclosures | 19 |
2.3 | Deciding Whether to Use an Xvhg or Xvhl at the Grid | 21 |
2.4 | Rigging an Array with Boxes Using | 22 |
2.5 | 25 | |
3 | 26 | |
3.1 | 26 | |
3.2 | Structural Rating Overview | 26 |
3.3 | Simplified | 27 |
3.4 | Complex | 30 |
3.5 | Wind Loading | 38 |
3.6 | 38 | |
4 Rigging Inspection and Precautions | 39 | |
References | ............................................................................................................................................................... | 41 |
Notes | 42 |
1 |