Step 1: Attatch one or more boxes to the grid using two grid straps at the front and two grid straps at the rear. Lift the array.

Step 6: Swing the next-to-bottom box up and attach the two linking straps at the front to the box above.

Step 2: Roll one box with the front

Step 3: Remove the dolly pin and

Step 4: Roll the next box on a front

dolly into position and lower the

lift the array. Remove the dolly.

dolly into position. Lower the array

array to align the bottom box in the

 

and install the two rear hinges

array to the box with the front dolly.

 

between the bottom array box and

Install the rear hinges one at a

 

the dolly box as done in step 3.

time. To ease installation the

 

 

boxes must be held parallel. Lift

 

 

the suspended box or the dolly box

 

 

as necessary to facilitate the hinge

 

 

installation.

 

 

Step 7: Roll another box with the

Step 8: Remove the dolly pin and

Step 9: Swing the next-to-bottom

front dolly into position and lower

lift the array. Remove the dolly.

box up and attach the two linking

the array to align the bottom box in

 

straps at the front to the box

the array to the box with the front

 

above. Repeat steps 7, 8, and 9

dolly. Install the two rear hinges

 

until as necessary to build the

and two front straps as described

 

array.

in step 2.

 

 

Step 5: Remove the dolly pin and lift the array. Remove the dolly.

Step 10: Swing the bottom box up and attach the two linking straps at the front to the box above.

Figure 10:

Flying with Front Dollies

The two boxes must be held parallel during the installation of the rigging hinge. If there is a slight vertical misalignment that causes the hinge to bind during installation, either the suspended box or the box on the dolly may be manually lifted to facilitate the hinge installation. Once both rear hinges are secured, the array is lifted until the box on the Front Dolly is no longer contacting the ground.

The Front Dolly is then removed from the bottom box. Do not attach the front Xvsl rigging straps yet on the bottom box. The array is then raised and another box on a Front Dolly is rolled into position from behind the array. The two Xvhl linking hinges are then simultaneously installed in the rigging on the suspended box and the box on the dolly as previously described.

ELECTRO-VOICE®￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

24

Page 25
Image 25
Telex ELECTRO-VOICE X-Line TM manual Flying with Front Dollies