NOTE If the load requires a neutral, a bypass source neutral must be provided. If the load does not require a neutral and there is no neutral conductor connected at the bypass input, a neutral to ground bonding jumper must be
installed. DO NOT install both a source neutral and a bonding jumper.
Figure
1027212 | UPS 225 - 275 kVA | 45 |
Revision B | User’s and Installation Guide |
|