Tiger RBF-14C manual Boom Unit Pre-OperationInspection and Service, Frame Weldment

Models: RBF-14C

1 91
Download 91 pages 6.56 Kb
Page 61
Image 61
6.2 Boom Unit Pre-Operation Inspection and Service

OPERATION

6.2 Boom Unit Pre-Operation Inspection and Service

Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be repaired and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:

¾Ensure that the Manual Canister is secured to the Boom unit with the Operator’s Manual inside.

¾Ensure all decals are in place and legible. Replace missing, worn, and non-legible decals.

NOTE: The mower Operator’s Manual and affixed Decals contain important instructions on the safe and proper use of the mower. Maintain these important safety features on the mower in good condition to ensure the information is available to the operator at all times.

FRAME ASSEMBLY

¾Inspect condition of mounting frame weldment.

¾Inspect condition of King Post frame.

¾Ensure all bolts and screws are in position and are properly torqued.

¾Ensure all pins are in place and fastened with screws.

¾Ensure frame is properly mounted to tractor and hardware is properly installed and tightened.

BOOM ARM ASSEMBLY

¾Inspect condition of each arm section weldment

¾Ensure all pins are in place.

¾Ensure all bolts and screws are properly installed.

¾Check condition of teflon bushings at boom pivot points.

¾Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly.

¾Ensure that all joints are lubricated. See Maintenance Section for Lubrication Chart.

Frame

Weldment

WARNING!

Never attempt to lubricate, adjust, or remove material from the Implement while it is in motion

 

or while tractor engine is running. Make sure the tractor engine is off before working on the

 

Implement. (SG-20)

 

RBF-14C 07/04

Operation Section 4-11

© 2004 Alamo Group Inc.

 

Page 61
Image 61
Tiger RBF-14C manual Boom Unit Pre-OperationInspection and Service, Frame Weldment