Assembly Section 2-17
ASSEMBLY

CONTINUOUS DUTY SOLENOID SWITCH

Mount the solenoid switch, drill holes to match, and 30 AMP breaker mounting t ab, mount
in dry and well protected area. Secure with 3/8” x 1” capscrews, lockwashers, and hex nuts.
A.) RED 6 GA. wire from terminal (D) to +12 volt battery post on starter solenoid.
B.) RED 14 GA. wire from terminal (C) to +12 terminal on fuel pump.
C.) GREEN 14 GA. wire from terminal (B) to negative ground.
D.) RED 8 GA. wire from terminal (A) to 30 AMP breaker.
E.) RED 14 GA. wire from terminal (A) to double switch box.
F.) RED 14 GA. wire from terminal (A) to temperature gauge. (optional)
G.) RED 8 GA. wire from breaker to reverser switch terminal (2).
H) RED 8 GA. wire from terminal (1) to +12 volt terminal on cooler fan.
I). BLACK 8 GA. wire from terminal (3) to ground on cooler fan.
J.) BLACK 8 GA. wire form terminal (4) to control panel ground.