6F3B0360 |
7.Start up and Power down methods
7.1Start up method
(1)Connect power supply cables to individual stations which are connected to the Active Star Coupler.
(2)Connect the connecting station with the Active Star Coupler, or an Active Star Coupler with another Active Star Coupler (in the case of
(3)Set the operational mode switch.
(4)Supply power to the Active Star Coupler and to each station. (Note) Either of the two may be actuated first.
(5)Begin the transmission to each station. (Refer to the instruction manual for respective stations.)
(6)Through the
7.2Power down method
(1)Cut off the power supply to the Active Star Coupler and to each station. (Note) Either of the two may be cut off first.
TOSLINE S20 | 21 |