17
Gigabit Unmanaged Switch
Note: The figure is to illustrate the applic ation and principle. The power plug you get
from the pa ckage and th e socket in your situation will comply with the regulation in
your country, so they may differ from the figure above.
Initialization212
After the device i s powered on, it b egins the Power-On Self-Test. A series of tests run
automatically to ensure the device functions prope rly. During this time, its LED indica-
tors will respond as follows:
All of the LED indicators will flash momentarily for one second, which repre sents a
resetting of the system.
The Power LED indicator will light up.
Connection