Manuals
/
Trane
/
Kitchen Appliance
/
Ventilation Hood
Trane
750 CFM, 1500 CFM manual Unit Wiring, End Device Package
Models:
750 CFM
1500 CFM
1
37
40
40
Download
40 pages
23.79 Kb
33
34
35
36
37
38
39
40
<
>
Troubleshooting
Specs
Install
Filter Replacement
Warranty
Dimension
Maintenance
Wiring
Problem Room too cool
Soldering procedures are as follows
Page 37
Image 37
Unit Wiring
End Device Package
120V/1 PH -
3-Speed,
4-Pipe
Hot Water/Chilled Water
UV-SVN03D-EN
37
Page 36
Page 38
Page 37
Image 37
Page 36
Page 38
Contents
Vertical Unit Ventilator
Installation Owner Maintenance
Classroom Unit Ventilator Model VUV
October
UV-SVN03D-EN
2007 American Standard All rights reserved
Installation/Startup/Commissioning
Contents
Maintenance
Warranty Information
Microbial Growth
Pre-installation Checklist
Jobsite Inspection
Jobsite Storage
Access
General Information
Field Installed Controls Option
Unit Nameplate
Table 2 Face-bypass actuator specification
Table 1 OA/RA actuator specification
Table 3 Mod. water valve specification
Table 4 Isolation valve specification
Improper Unit Lift
Dimensions/Weights Clearance
Unit Location and Clearances Locate the unit in an indoor area. The
Standard Depth Unit
Dimensions
Dimensions
Falseback Unit
Dimensions
Dynamic Air Barrier Unit
Dimensions
End Covers
Dimensions
Wall Boxes
Dimensions
Crossover Piping
16 5/8 DEPTH UNIT
TOP VIEW
Wall Box Installation
Installation
Installation in Masonry Walls
Installation in Curtain Walls
General Installation Checks
Installation
Note All mounting fasteners are to be provided by the installer
Location Considerations
Figure 3 Mounting hole location
Installation
Equipment Damage
Improper Unit Lift
Installation
Unit Mounting
Piping Installation
Installation
Installation Crossover Piping
Note A P-trap is factory supplied in ev- ery vertical unit ventilator
Split System Units
Installation
Refrigerant Piping
Steam Piping
2-way valve
Installation
AB 3-way valve
Note Do not overtighten. Maxi- mum torque is 40 in-lb
Wiring
Installation
Isolation Valves Installation
Manually Opening Valve
Use Copper Conductors Only
Hazardous Voltage
Installation
Soldering procedures are as follows
Wiring continued
Installation
Hazardous Voltage
DX System
Table E1 VUV 075-150, Electrical Performance
Electrical Requirements
Table E1 VUV 075-150, Electrical Performance continued
Electrical Requirements
Pre-Start-up Checklist
Pre-Start Checklist
Is unit serviceable? See clearance specifications on page
Hazardous Service Procedures
Maintenance
Service Access
Periodic Maintenance
Hazardous Service Procedures
Maintenance
Access to Fanboard & Motor
Equipment Damage
Hazardous Service Procedures
Maintenance
Coil Cleaning
Preventive Maintenance
Warranty Information Standard Warranty
Warranty Information
Extended Warranty
Hazardous Service Procedures
Trouble Shooting Checklist
Problem
outside air temperature is below 35 F
Problem Room too cool
Trouble Shooting Checklist
Heating Cooling
Cause
Field Installed Wiring
Unit Wiring
120V/1 PH - 3-Speed
Unit Wiring
End Device Controls
120V/1 PH - 3-Speed, DX/Hot Water
Unit Wiring
End Device Package
480V/3 PH - 3-Speed, Chilled Water/Electric Heat 6-Element -page
End Device Package
Unit Wiring
480V/3 PH - 3-Speed, Chilled Water/Electric Heat 6-Element -page
End Device Package
Unit Wiring
120V/1 PH - 3-Speed, 4-Pipe Hot Water/Chilled Water
Unit Wiring
Tracer ZN520
120V/1 PH - 3-Speed, 4-Pipe Hot Water/Chilled Water
UV-SVN03D-EN
Trane