750 CFM, 1500 CFM manual End Device Package, Unit Wiring
Models:
750 CFM
1500 CFM
1
35
40
40
Download
40 pages
23.79 Kb
32
33
34
35
36
37
38
39
<
>
Troubleshooting
Specifications
Install
Filter Replacement
Warranty
Dimension
Maintenance
Wiring
Problem Room too cool
Soldering procedures are as follows
Page 35
Image 35
Unit Wiring
End Device Package
480V/3 PH -
3-Speed,
Chilled Water/Electric Heat
(6-Element)
-page
1
UV-SVN03D-EN
35
Page 34
Page 36
Page 35
Image 35
Page 34
Page 36
Contents
October
Installation Owner Maintenance
Vertical Unit Ventilator
Classroom Unit Ventilator Model VUV
UV-SVN03D-EN
2007 American Standard All rights reserved
Warranty Information
Contents
Installation/Startup/Commissioning
Maintenance
Jobsite Storage
Pre-installation Checklist
Microbial Growth
Jobsite Inspection
Unit Nameplate
General Information
Access
Field Installed Controls Option
Table 4 Isolation valve specification
Table 1 OA/RA actuator specification
Table 2 Face-bypass actuator specification
Table 3 Mod. water valve specification
Unit Location and Clearances Locate the unit in an indoor area. The
Dimensions/Weights Clearance
Improper Unit Lift
Standard Depth Unit
Dimensions
Dimensions
Falseback Unit
Dimensions
Dynamic Air Barrier Unit
Dimensions
End Covers
Dimensions
Wall Boxes
TOP VIEW
Crossover Piping
Dimensions
16 5/8 DEPTH UNIT
Installation in Curtain Walls
Installation
Wall Box Installation
Installation in Masonry Walls
Location Considerations
Installation
General Installation Checks
Note All mounting fasteners are to be provided by the installer
Figure 3 Mounting hole location
Installation
Unit Mounting
Improper Unit Lift
Equipment Damage
Installation
Note A P-trap is factory supplied in ev- ery vertical unit ventilator
Installation
Piping Installation
Installation Crossover Piping
Steam Piping
Installation
Split System Units
Refrigerant Piping
Note Do not overtighten. Maxi- mum torque is 40 in-lb
Installation
2-way valve
AB 3-way valve
Manually Opening Valve
Installation
Wiring
Isolation Valves Installation
Soldering procedures are as follows
Hazardous Voltage
Use Copper Conductors Only
Installation
DX System
Installation
Wiring continued
Hazardous Voltage
Table E1 VUV 075-150, Electrical Performance
Electrical Requirements
Table E1 VUV 075-150, Electrical Performance continued
Electrical Requirements
Is unit serviceable? See clearance specifications on page
Pre-Start Checklist
Pre-Start-up Checklist
Periodic Maintenance
Maintenance
Hazardous Service Procedures
Service Access
Equipment Damage
Maintenance
Hazardous Service Procedures
Access to Fanboard & Motor
Preventive Maintenance
Maintenance
Hazardous Service Procedures
Coil Cleaning
Extended Warranty
Warranty Information
Warranty Information Standard Warranty
outside air temperature is below 35 F
Trouble Shooting Checklist
Hazardous Service Procedures
Problem
Cause
Trouble Shooting Checklist
Problem Room too cool
Heating Cooling
120V/1 PH - 3-Speed
Unit Wiring
Field Installed Wiring
120V/1 PH - 3-Speed, DX/Hot Water
End Device Controls
Unit Wiring
480V/3 PH - 3-Speed, Chilled Water/Electric Heat 6-Element -page
End Device Package
Unit Wiring
480V/3 PH - 3-Speed, Chilled Water/Electric Heat 6-Element -page
Unit Wiring
End Device Package
120V/1 PH - 3-Speed, 4-Pipe Hot Water/Chilled Water
Unit Wiring
End Device Package
120V/1 PH - 3-Speed, 4-Pipe Hot Water/Chilled Water
Tracer ZN520
Unit Wiring
UV-SVN03D-EN
Trane