Trane GEV manual Dimensions/Weights Clearance, GEH 1/2 through 5 Ton Clearance

Models: GEV GEH

1 90
Download 90 pages 30.33 Kb
Page 8
Image 8
Dimensions/Weights

Dimensions/Weights

Clearance

GEH Clearance Dimensions Access to the unit for service pur- poses should be provided at instal- lation. All 1/2 through 5 ton configurations require an 18" (457

mm)surround clearance from oth- er mechanical and electrical equip- ment (where shown) to enable panel removal from the unit for service/maintenance ability. Some local codes require a greater ser- vice clearance than listed below. Check all code requirements prior to unit installations.

Equipment containing a same-side supply/return combination re- quires a 3" (229 mm) limitation on one side. Access to the TXV may not be possible with this 3" (229

mm)clearance. This configuration is typically applied in a corridor in- stallation, where space limitations force the left or right side of the unit against a wall.

Service clearance dimensions for the 6 through 15 ton horizontal in- cludes a two side access appropri- ate for control and blower motor/ wheel access. Some local codes require a greater service clearance than listed below. Check all code requirements prior to unit installa- tions.

GEH 1/2 through 5 Ton Clearance

GEH 6 through 15 Ton Clearance

8

WSHP-SVX01D-EN

Page 8
Image 8
Trane GEV manual Dimensions/Weights Clearance, GEH 1/2 through 5 Ton Clearance, GEH 6 through 15 Ton Clearance