Installation Waterside Economizer
8Thread the bulb and wire through the low voltage hole of the water- source heat pump.
Step 8
9
Step 9
10Bundle excess sensor wire, and wire tie the bundle neatly.
11Thread the valve’s wire lead through the low voltage hole of the heat pump.
Step 11
12Wire the valve to the terminal strip according to the unit wire diagram located on the service control panel.
RED =
BLK =
WHT =
13Bundle excess valve wire, and wire tie the bundle neatly.
14 Install control side service panel.
15Install the six hanging isolation grommets into the hanging brackets The unit isolators were located in the
Step 15
16Insulate the economizing piping package and the supply/return/
Note: Trane does not provide in- sulation on the economizing piping package. This insulation must be field provided and field installed.
17Install filter rack (top and bottom) to the economizing package. The filter rack is located in the unit’s packaging along with the filter.
18Hang Unit. See page 51 for hang- ing of the packaged unit. Bottom screws referenced in step 4 must be installed at this time.
Step 10
Step 13
61 |