Assembly & | 3 |
| |
|
|
Contents of Carton |
|
• | Two Ignition Keys | • | One Snow Thrower | • | One Chute Assembly |
• | One 110V Extension Cord | • | One Snow Thrower Operator’s |
|
|
|
|
| Manual |
|
|
Assembly
Handle
1.Place the shift lever in the
2.Remove the lower plastic wing nut and carriage bolt from each side of the upper handle; then raise the upper handle assembly until it snaps over the lower handle. See Figure
Chute Assembly
1.Remove wing nut and hex screw from chute control assembly and clevis pin and cotter pin from chute support bracket. Position the chute assembly
2
1 1
Figure
Figure
3.Looking beneath the handle panel, check that all of the cables (steering, auger, shift, and drive) are properly routed and not pinched or kinked.
NOTE: Make certain the upper ends of each cable are seated properly in the proper brackets.
4.Secure the handle by tightening the plastic knob located on both the left and right sides of the handle. Remove and discard any rubber bands, if present. They are for packaging purposes only.
7