True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
STARTUP
RECOMMENDATION
Before loading product we recommend you run your True unit
empty for twenty or thirty minutes. This allows you to be sure Serial Number electrical wiring and installation are correct and no shipping
damage has occurred. Remember, our factory warranty does not cover product loss!
REPLACEMENT PARTS
TRUE maintains a record of the cabinet serial number for your unit. If at any time during the life of your display case, a part is needed, you may obtain this part by furnishing the model number and serial number to the company from whom you purchased the cabinet. Call
SHELVING INSTALLATION / OPERATION
SHELF INSTALLATION:
Step 1
A.Hook shelf clips onto shelf standards. (See illustration).
B.Position all four shelf clips equal in distance from the floor for flat shelves.
WIRE SHELVES:
Wire shelves are oriented so that cross support bars are facing down.
Step 2
Place shelves on shelf clips making sure all corners are seated properly.
Shelf
Shelf
Clip
Shelf
Standards
Shelf
Pillaster
9 | www.truemfg.com | 9 |